Cost-benefit assessment of IT systems in the construction industry (Record no. 47649)

MARC details
000 -LEADER
fixed length control field 00408nam a2200145Ia 4500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 180208s9999||||xx |||||||||||||| ||und||
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number B TH-0248
Item number DAL
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Dalwadi, Prashant
245 #0 - TITLE STATEMENT
Title Cost-benefit assessment of IT systems in the construction industry
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Date of publication, distribution, etc 2002
300 ## - PHYSICAL DESCRIPTION
Extent viii,50,xi,45,xvp.
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Akalkotkar, Prakash V. (Guide)
891 ## - Topic
Topic 1997 Batch
891 ## - Topic
Topic FT-UG
Holdings
Withdrawn status Lost status Damaged status Not for loan Collection code Withdrawn status Home library Current library Date acquired Full call number Barcode Date last seen Price effective from Koha item type
        Faculty of Technology   CEPT Library CEPT Library 08/02/2018 B TH-0248 DAL B03098 08/02/2018 08/02/2018 Thesis
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials