Study of life cycle costing for Griha-rated green buildings in India (Also available on CD) (Record no. 47402)

MARC details
000 -LEADER
fixed length control field 04116nam a2200169Ia 4500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 180208s9999||||xx |||||||||||||| ||und||
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number B TH-0545
Item number SHA
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Shah, Sonam
245 #0 - TITLE STATEMENT
Title Study of life cycle costing for Griha-rated green buildings in India (Also available on CD)
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Date of publication, distribution, etc 2009
300 ## - PHYSICAL DESCRIPTION
Extent vi,48,iv,20p.,CD-ROM
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note Contents<br/>1. INTRODUCTION TO THE STUDY<br/>1.1 Present Scenario 1<br/>1.2 Need For The Study 2<br/>1.3 Objective Of The Study 2<br/>1.4 Scope Of Study 2<br/>1.5 Methodology Of Study 2<br/>1.6 Schedule Of Study 4<br/>2. LITERATURE STUDY<br/>2.1 Terminology 5<br/>2.2 Green Buildings For Economy And Efficiency 6<br/>2.3 Life Cycle Costing- Concept 6<br/>2.4 Why Life Cycle Costing? 6<br/>2.5 History Of Life Cycle Costing 6<br/>2.6 Procedure Of Life Cycle Costing 7<br/>2.6.1 IDENTIFY ALTERNATIVES 7<br/>2.6.2 DEFINE CONSTANT PARAMETERS 7<br/>2.6.3 IDENTIFY COSTS AND SAVINGS 8<br/>2.6.4 GENERATE LCC FOR EACH ALTERNATIVE 8<br/>2.6.5 PERFORM LCC COMPARISON 8<br/>2.7 Pros And Cons Of Life Cycle Costing 8<br/>2.8 Costs Included In Life Cycle Costing 8<br/>2.8.1 INITIAL INVESTMENT COSTS 9<br/>2.8.2 CAPITAL REPLACEMENT COSTS 9<br/>2.8.3 RESALE VALUE 9<br/>2.8.4 OM&R COSTS 9<br/>2.8.5 ENERGY COSTS 10<br/>2.9 Parameters Affecting Life Cycle Costing 10<br/>2.9.1 INFLATION RATE 11<br/>2.9.2 DISCOUNT RATE1 11<br/>2.9.3 ESCALATION RATE1 11<br/>2.9.4 STUDY PERIOD 11<br/>2.10 Present Value Factors1 11<br/>2.10.1 SINGLE PRESENT VALUE FACTOR 11<br/>2.10.2 UNIFORM PRESENT VALUE FACTOR 12<br/>2.10.3 MODIFIED UNIFORM PRESENT VALUE FACTOR 12<br/>2.11 Formula For Life Cycle Costing 12<br/>2.12 Supplementary Measures Of Life Cycle Costing 13<br/>2.12.1 NET SAVINGS 13<br/>2.12.2 PAYBACK PERIOD 13<br/>2.12.3 SAVINGS TO INVESTMENT RATIO 13<br/>2.12.4 SENSITIVITY ANALYSIS 14<br/>3. DATA COLLECTION<br/>3.1. Selection Criteria For Case Studies 15<br/>3.2. Methodology Of Data Collection 15<br/>3.3. Questionnaire 16<br/>3.3.1 ANSWERS TO QUESTIONNAIRE FOR CASE 1- CESE BUILDING, IIT, KANPUR 16<br/>3.3.2 ANSWERS TO QUESTIONNAIRE FOR CASE 2- GREEN SPACES, FARIDABAD, HARYANA 19<br/>4. DATA ANALYSIS<br/>4.1 Methodology Of Data Analysis 24<br/>4.2 Cost Segregation 25<br/>4.3 Inflation Rate, Discount Rate & Escalation Rate 25<br/>4.4 Present Value Factors 26<br/>4.4.1 SINGLE PRESENT VALUE FACTOR (SPV) 26<br/>4.4.2 UNIFORM PRESENT VALUE FACTOR (UPV) 26<br/>4.4.3 MODIFIED UNIFORM PRESENT VALUE FACTOR (UPV*) 26<br/>4.5 Single Costs 27<br/>4.5.1 CASE 1: CESE BUILDING, IIT, KANPUR 27<br/>4.5.2 CASE 2: GREEN SPACES, FARIDABAD, HARYANA 28<br/>4.5.3 REPLACEMENT COSTS OF LIGHTING FIXTURES 28<br/>4.5.4 PRESENT VALUE OF SINGLE COSTS FOR CASE 1 & CASE 2 31<br/>4.6 Uniformly Annually Recurring Costs 32<br/>4.6.1 CASE 1: CESE BUILDING, IIT, KANPUR 32<br/>4.6.2 CASE 2: GREEN SPACES, FARIDABAD, HARYANA 32<br/>4.6.3 PRESENT VALUE OF UNIFORMLY ANNUALLY RECURRING COSTS FOR CASE 1 & CASE 2 32<br/>4.7 Non- Uniformly Annually Recurring Costs 33<br/>4.7.1 CASE 1: CESE BUILDING, IIT, KANPUR 33<br/>4.7.2 CASE 2: GREEN SPACES, FARIDABAD, HARYANA 33<br/>4.7.3 PRESENT VALUE OF NON-UNIFORMLY ANNUALLY RECURRING COSTS FOR CASE 1 & CASE 2 34<br/>4.8 Life Cycle Costs 34<br/>4.8.1 CASE 1: CESE BUILDING, IIT, KANPUR 35<br/>4.8.2 CASE 2: GREEN SPACES, FARIDABAD, HARYANA 36<br/>4.9 Net Savings, Payback Period & Savings To Investment Ratio 37<br/>4.9.1 CASE 1: CESE BUILDING, IIT, KANPUR 37<br/>4.9.2 CASE 2: GREEN SPACES, FARIDABAD, HARYANA 39<br/>4.10 Sensitivty Analysis 41<br/>4.10.1 DISCOUNT RATE 41<br/>4.10.2 ESCALATION RATE 42<br/>4.10.3 ENERGY CHARGES 43<br/>5. CONCLUSION<br/>5.1 Major Outcomes From Questionnaire 45<br/>5.2 Major Outcomes Of The Study 46<br/>6. FUTURE RECOMMENDATIONS<br/>6.1 Recommendations 47<br/>6.2 Future Scope Of Study 47<br/>ANNEXURE<br/>FORMAT OF QUESTIONNAIRE I<br/>A. GENERAL DETAILS I<br/>B. ENVELOPE DETAILS II<br/>C. LIGHTING DETAILS III<br/>D. ELECTRICAL DETAILS III<br/>E. HVAC DETAILS III<br/><br/>
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Majumdar, Mili (Guide)
890 ## - Country
Country India
891 ## - Topic
Topic 2004 Batch
891 ## - Topic
Topic FT-UG
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection code Withdrawn status Home library Current library Date acquired Source of acquisition Full call number Barcode Date last seen Price effective from Koha item type
    Dewey Decimal Classification     Faculty of Technology   CEPT Library CEPT Library 08/02/2018 Faculty of Technology B TH-0545 SHA 022843 08/02/2018 08/02/2018 Thesis
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials