Study of life cycle costing for Griha-rated green buildings in India (Also available on CD) (Record no. 47402)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 04116nam a2200169Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180208s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | B TH-0545 |
Item number | SHA |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Shah, Sonam |
245 #0 - TITLE STATEMENT | |
Title | Study of life cycle costing for Griha-rated green buildings in India (Also available on CD) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2009 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | vi,48,iv,20p.,CD-ROM |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | Contents<br/>1. INTRODUCTION TO THE STUDY<br/>1.1 Present Scenario 1<br/>1.2 Need For The Study 2<br/>1.3 Objective Of The Study 2<br/>1.4 Scope Of Study 2<br/>1.5 Methodology Of Study 2<br/>1.6 Schedule Of Study 4<br/>2. LITERATURE STUDY<br/>2.1 Terminology 5<br/>2.2 Green Buildings For Economy And Efficiency 6<br/>2.3 Life Cycle Costing- Concept 6<br/>2.4 Why Life Cycle Costing? 6<br/>2.5 History Of Life Cycle Costing 6<br/>2.6 Procedure Of Life Cycle Costing 7<br/>2.6.1 IDENTIFY ALTERNATIVES 7<br/>2.6.2 DEFINE CONSTANT PARAMETERS 7<br/>2.6.3 IDENTIFY COSTS AND SAVINGS 8<br/>2.6.4 GENERATE LCC FOR EACH ALTERNATIVE 8<br/>2.6.5 PERFORM LCC COMPARISON 8<br/>2.7 Pros And Cons Of Life Cycle Costing 8<br/>2.8 Costs Included In Life Cycle Costing 8<br/>2.8.1 INITIAL INVESTMENT COSTS 9<br/>2.8.2 CAPITAL REPLACEMENT COSTS 9<br/>2.8.3 RESALE VALUE 9<br/>2.8.4 OM&R COSTS 9<br/>2.8.5 ENERGY COSTS 10<br/>2.9 Parameters Affecting Life Cycle Costing 10<br/>2.9.1 INFLATION RATE 11<br/>2.9.2 DISCOUNT RATE1 11<br/>2.9.3 ESCALATION RATE1 11<br/>2.9.4 STUDY PERIOD 11<br/>2.10 Present Value Factors1 11<br/>2.10.1 SINGLE PRESENT VALUE FACTOR 11<br/>2.10.2 UNIFORM PRESENT VALUE FACTOR 12<br/>2.10.3 MODIFIED UNIFORM PRESENT VALUE FACTOR 12<br/>2.11 Formula For Life Cycle Costing 12<br/>2.12 Supplementary Measures Of Life Cycle Costing 13<br/>2.12.1 NET SAVINGS 13<br/>2.12.2 PAYBACK PERIOD 13<br/>2.12.3 SAVINGS TO INVESTMENT RATIO 13<br/>2.12.4 SENSITIVITY ANALYSIS 14<br/>3. DATA COLLECTION<br/>3.1. Selection Criteria For Case Studies 15<br/>3.2. Methodology Of Data Collection 15<br/>3.3. Questionnaire 16<br/>3.3.1 ANSWERS TO QUESTIONNAIRE FOR CASE 1- CESE BUILDING, IIT, KANPUR 16<br/>3.3.2 ANSWERS TO QUESTIONNAIRE FOR CASE 2- GREEN SPACES, FARIDABAD, HARYANA 19<br/>4. DATA ANALYSIS<br/>4.1 Methodology Of Data Analysis 24<br/>4.2 Cost Segregation 25<br/>4.3 Inflation Rate, Discount Rate & Escalation Rate 25<br/>4.4 Present Value Factors 26<br/>4.4.1 SINGLE PRESENT VALUE FACTOR (SPV) 26<br/>4.4.2 UNIFORM PRESENT VALUE FACTOR (UPV) 26<br/>4.4.3 MODIFIED UNIFORM PRESENT VALUE FACTOR (UPV*) 26<br/>4.5 Single Costs 27<br/>4.5.1 CASE 1: CESE BUILDING, IIT, KANPUR 27<br/>4.5.2 CASE 2: GREEN SPACES, FARIDABAD, HARYANA 28<br/>4.5.3 REPLACEMENT COSTS OF LIGHTING FIXTURES 28<br/>4.5.4 PRESENT VALUE OF SINGLE COSTS FOR CASE 1 & CASE 2 31<br/>4.6 Uniformly Annually Recurring Costs 32<br/>4.6.1 CASE 1: CESE BUILDING, IIT, KANPUR 32<br/>4.6.2 CASE 2: GREEN SPACES, FARIDABAD, HARYANA 32<br/>4.6.3 PRESENT VALUE OF UNIFORMLY ANNUALLY RECURRING COSTS FOR CASE 1 & CASE 2 32<br/>4.7 Non- Uniformly Annually Recurring Costs 33<br/>4.7.1 CASE 1: CESE BUILDING, IIT, KANPUR 33<br/>4.7.2 CASE 2: GREEN SPACES, FARIDABAD, HARYANA 33<br/>4.7.3 PRESENT VALUE OF NON-UNIFORMLY ANNUALLY RECURRING COSTS FOR CASE 1 & CASE 2 34<br/>4.8 Life Cycle Costs 34<br/>4.8.1 CASE 1: CESE BUILDING, IIT, KANPUR 35<br/>4.8.2 CASE 2: GREEN SPACES, FARIDABAD, HARYANA 36<br/>4.9 Net Savings, Payback Period & Savings To Investment Ratio 37<br/>4.9.1 CASE 1: CESE BUILDING, IIT, KANPUR 37<br/>4.9.2 CASE 2: GREEN SPACES, FARIDABAD, HARYANA 39<br/>4.10 Sensitivty Analysis 41<br/>4.10.1 DISCOUNT RATE 41<br/>4.10.2 ESCALATION RATE 42<br/>4.10.3 ENERGY CHARGES 43<br/>5. CONCLUSION<br/>5.1 Major Outcomes From Questionnaire 45<br/>5.2 Major Outcomes Of The Study 46<br/>6. FUTURE RECOMMENDATIONS<br/>6.1 Recommendations 47<br/>6.2 Future Scope Of Study 47<br/>ANNEXURE<br/>FORMAT OF QUESTIONNAIRE I<br/>A. GENERAL DETAILS I<br/>B. ENVELOPE DETAILS II<br/>C. LIGHTING DETAILS III<br/>D. ELECTRICAL DETAILS III<br/>E. HVAC DETAILS III<br/><br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Majumdar, Mili (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2004 Batch |
891 ## - Topic | |
Topic | FT-UG |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Faculty of Technology | CEPT Library | CEPT Library | 08/02/2018 | Faculty of Technology | B TH-0545 SHA | 022843 | 08/02/2018 | 08/02/2018 | Thesis |