Life cycle cost assessment of a typical urban flyover : a technical report (Record no. 45508)

MARC details
000 -LEADER
fixed length control field 04182 a2200157 4500
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 624.2
245 ## - TITLE STATEMENT
Title Life cycle cost assessment of a typical urban flyover : a technical report
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Place of publication, distribution, etc Kolkata
Name of publisher, distributor, etc Institute for Steel Development & Growth (INSDAG)
Date of publication, distribution, etc 2002
300 ## - PHYSICAL DESCRIPTION
Extent vii,140,viiip.
440 ## - SERIES STATEMENT/ADDED ENTRY--TITLE
Title INSDAG Publication
Volume number/sequential designation INS/PUB/017
9 (RLIN) 58683
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note Contents <br/> SUMMARY 1-2<br/>1. INTRODUCTION, APPROACH & METHODOLOGY 3-5<br/>1.1. Introduction and Background 3<br/>1.2. Objective 4<br/>1.3. Approach 4<br/>1.4. Steel Intensive Construction for Indian Bridges and Flyovers 4<br/>2. CONCEPTS OF LIFE CYCLE COST 6-14<br/>2.1 Introduction to Life Cycle Cost 6<br/>2.2 Methodology of Life Cycle Cost 6<br/>2.3 Some Essential Terms and Concepts on LCC 7<br/>2.4 Some Important Formulae for Present Value Calculation 12<br/>3. LCC RELATED CODES AND STANDARDS 15-17<br/>3.1 Some LCC Related Standards 15<br/>3.2 Brief review ofiRC SP 30 w.r.t LCC 15<br/>3.3 Brief review on Draft Approach Document on WLC 17<br/>4. THE CURRENT STUDY 18-21<br/>4.1 The Study 18<br/>4.2 The Project Brief 18<br/>4.3 Assignment Sketch 21<br/>5. DESIGN APPROACH AND DESIGN PROCESS 22-40<br/>5.1 Design Arrangement 22<br/>5.2 Materials 23<br/>5.3 Loading 23 <br/>5.4 Foundation System 24<br/>5.5 Reference Codes and Standards 24<br/>5.6 Design Process 24<br/>5.7 Schematic Arrangements 25<br/>6 ESTIMA TION OF INITIAL COST 41-94<br/>6.1 General Basis of Cost Assessment 41<br/>6.2 Break-up of Modified Rates of Calcutta Flyover 43<br/>6.3 Details of Rates Used for the Murribai Flyover 47<br/>6.4 Break-up of Cost for Common Approach Ramp 49<br/>6.5 Simply Supported Span - RCC Option Cost for Calcutta 50<br/>6.6 Continuous Span - RCC Option Cost for Calcutta 53<br/>6.7 Simply Supported Span -PSC Option Cost for Calcutta 56<br/>6.8 Continuous Span -PSC Option Cost for Calcutta 59<br/>6.9 Simply Supported Span -RCC Option Cost for Mumbai 62<br/>6.10 Continuous Span -RCC Option Cost for Mumbai 65<br/>6.11 Simply Supported Span -PSC Option Cost for Mumbai 68<br/>6.12 Continuous Span -PSC Option Cost for Muinbai 71<br/>6.13 Simply Supported (25m span) -Steel Option Cost for Mumbai 74<br/>6.14 Simply Supported (20m span) -Steel Option Cost for Mumbai 76<br/>6.15 Continuous (25m span) -Steel Option Cost for Mumbai 78<br/>6.16 Continuous (20m span) -Steel Option Cost for Mumbai 80<br/>6.17 Simply Supported (25 m span) -Steel Option Cost for Calcutta 82<br/>6.18 Simply Supported (20m span) -Steel Option Cost for Calcutta 84<br/>6.19 Continuous (25 m span) -Steel Option Cost for Calcutta 86<br/>6.20 Continuous (20 m span) -Steel Option Cost for Calcutta 88<br/>6.21 Summary of Direct Cost Tables 90<br/>6.22 Selection and Comparison of Most Competitive Options 92<br/>7. ESTIMATION OF CONSTRUCTION TIME 95-107<br/>7.1 Considerations for Time Estimate 95<br/>7.2 Estimation of Construction Time 95<br/>7.3 Implementation Schedules 101<br/>7.4 Construction Equipment Considered 106<br/>8 INTEREST, INFLATION & DISCOUNT RATES 108-112<br/>8.1 Introduction 108<br/>8.2 Assessment of Interest Rate Value 108<br/>8.3 Assessment of Annual Inflation Rate Value 109<br/>8.4 Assessment of Discount Rate Value 110<br/>8.5 Discount Factors 112<br/>9. ASSESSMENT OF TIME COST 113-114<br/>9.1 Assessment of Cost 113<br/>9.2 Observations 114<br/>10. LIFE CYCLE COST HEADS 115-116<br/>10.1 Introduction . 115<br/>10.2 Base line 115<br/>10.3 Lifespan! study period 115<br/>11. ROAD USER COST 117-120<br/>11.1 Road User Cost 117<br/>11.2 Importance 117<br/>11.3 Estimation 118<br/>11.4 Summary of Const. Cost, Time Cost and Road User Cost 120<br/>12. ROUTINE INSPECTION & PERIODIC MAINTENANCE COST 121-124<br/>12.1 Routine Inspection Cost 121<br/>12.2 Periodic Maintenance Cost • 122<br/>13. MAJOR REPAIR COST & END USE VALUE 125-126<br/>13.1 Repair/Rehabilitation Cost 125<br/>13.2 End Use Value 126<br/>14. .LIFE CYCLE COST SUMMARY TABLES 127-136<br/>14.1 LCC Summary Table for Calcutta Flyover 127<br/>14.2 LCC Summary Table for Mumbai Flyover 131<br/>14.3 Observations 134<br/>Annexure I 137<br/>Annexure II 138<br/><br/>
600 ## - SUBJECT ADDED ENTRY--PERSONAL NAME
9 (RLIN) 39390
890 ## - Country
Country India
891 ## - Topic
Topic FT
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection code Withdrawn status Home library Current library Date acquired Source of acquisition Cost, normal purchase price Total Checkouts Full call number Barcode Date last seen Date last borrowed Cost, replacement price Price effective from Koha item type
    Dewey Decimal Classification     Faculty of Technology   CEPT Library CEPT Library 11/12/2018 INSDAG 953.00 1 624.2 017878 22/12/2018 16/12/2018 900.00 24/02/2017 Book
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999