Maintenance and protection of traffic (MPT) at active work zone (Softcopy is also available)
Boghani, Jayraj (UG180115)
Maintenance and protection of traffic (MPT) at active work zone (Softcopy is also available) - 2023 - xvi,48p.
TABLE OF CONTENTS
ABSTRACT i
UNDERTAKING iii
CERTIFICATE v
ACKNOWLEDGEMENTS vii
ABBREVIATIONS ix
TABLE OF CONTENTS xi
LIST OF FIGURES xv
CHAPTER-1: INTRODUCTION 1
1.1 Need for the study 2
1.2 Objective 2
CHAPTER-2: LITERATURE REVIEW 3
2.1 Paper: 1 3
2.1.1 Name of paper: 3
2.1.2 Location: 3
2.1.3 Need for the study: 3
2.1.4 Methodology: 3
2.1.5 Conclusion (results): 3
2.2 Paper: 2 4
2.2.1 Name of paper: 4
2.2.2 Location: 4
2.2.3 Need for the study: 4
2.2.4 Methodology: 4
2.2.5 Conclusion (results): 4
2.3 Paper: 3 5
2.3.1 Name of paper: 5
2.3.2 Location: 5
2.3.3 Need for the study: 5
2.3.4 Methodology: 5
2.3.5 Conclusion (results): 5
2.4 Paper: 4 6
2.4.1 Name of paper: 6 xii
2.4.2 Location: 6
2.4.3 Need for the study: 6
2.4.4 Methodology: 6
2.4.5 Conclusion (results): 6
2.5 Paper: 5 7
2.5.1 Name of paper: 7
2.5.2 Location: 7
2.5.3 Need for the study: 7
2.5.4 Methodology: 7
2.5.5 Conclusion (results): 7
2.6 Paper: 6 8
2.6.1 Name of paper: 8
2.6.2 Location: 8
2.6.3 Need for the study: 8
2.6.4 Methodology: 8
2.6.5 Conclusion (results): 8
CHAPTER-3: RESEARCH METHODOLOGY 9
CHAPTER-4: DATA COLLECTION 11
4.1 Case study 1 (Shukan circle to Raspan circle) 12
4.1.1 Site location 12
4.1.2 Layout plan 13
4.1.3 Work Zone Traffic Management Plan 14
4.1.4 Site photos 15
4.1.5 Observations for work zone safety 20
4.2 Case study 2 (SP ring road - service road) 21
4.2.1 Site location 21
4.2.2 Layout plan 22
4.2.3 Work Zone Traffic Management Plan 23
4.2.4 Site photos 24
4.3 Case study 3 (Ujala circle bridge) 25
4.3.1 Site location 25
4.3.2 Layout plan 26
4.3.3 Work Zone Traffic Management Plan 27
4.3.4 Work Zone Traffic Management Plan - PART 1 28
4.3.5 Work Zone Traffic Management Plan - PART 2 29
4.3.6 Site photos 30
CHAPTER-5: DATA ANALYSIS 35
5.1 INTRODUCTION OF WTMP 35
5.1.1 Purpose of Road Signs 35
5.1.2 Road Classifications 35
5.1.3 The following factors shall be considered when designing a taper. 35
5.1.4 Designing of Taper Length for SHORT-DURATION Work 36
5.1.5 Designing of Taper Length for SHORT DURATION and LONG DURATION Work 36
5.1.6 Designing of Taper Length for LONG DURATION Work 36
5.1.7 Traffic Control Devices 36
5.2 Case study - 1: Shukan Circle to Raspan Circle, Nikol 37
5.2.1 Work zone traffic management plan (WTMP) 37
5.2.2 Work zone traffic management plan - PART 1 37
5.2.3 Work zone traffic management plan - PART 2 37
5.2.4 Work zone traffic management plan and section 38
5.3 Case study - 2 SP ring road - service road 39
5.3.1 Work zone traffic management plan (WTMP) 39
5.3.2 Zoomed Plan 39
5.3.3 Work zone traffic management plan section 40
CHAPTER-6: Conclusion 41
REFERENCES 43
APPENDIX 45
Application of Normal Regulatory Signs 45
B TH-1004 / BOG
Maintenance and protection of traffic (MPT) at active work zone (Softcopy is also available) - 2023 - xvi,48p.
TABLE OF CONTENTS
ABSTRACT i
UNDERTAKING iii
CERTIFICATE v
ACKNOWLEDGEMENTS vii
ABBREVIATIONS ix
TABLE OF CONTENTS xi
LIST OF FIGURES xv
CHAPTER-1: INTRODUCTION 1
1.1 Need for the study 2
1.2 Objective 2
CHAPTER-2: LITERATURE REVIEW 3
2.1 Paper: 1 3
2.1.1 Name of paper: 3
2.1.2 Location: 3
2.1.3 Need for the study: 3
2.1.4 Methodology: 3
2.1.5 Conclusion (results): 3
2.2 Paper: 2 4
2.2.1 Name of paper: 4
2.2.2 Location: 4
2.2.3 Need for the study: 4
2.2.4 Methodology: 4
2.2.5 Conclusion (results): 4
2.3 Paper: 3 5
2.3.1 Name of paper: 5
2.3.2 Location: 5
2.3.3 Need for the study: 5
2.3.4 Methodology: 5
2.3.5 Conclusion (results): 5
2.4 Paper: 4 6
2.4.1 Name of paper: 6 xii
2.4.2 Location: 6
2.4.3 Need for the study: 6
2.4.4 Methodology: 6
2.4.5 Conclusion (results): 6
2.5 Paper: 5 7
2.5.1 Name of paper: 7
2.5.2 Location: 7
2.5.3 Need for the study: 7
2.5.4 Methodology: 7
2.5.5 Conclusion (results): 7
2.6 Paper: 6 8
2.6.1 Name of paper: 8
2.6.2 Location: 8
2.6.3 Need for the study: 8
2.6.4 Methodology: 8
2.6.5 Conclusion (results): 8
CHAPTER-3: RESEARCH METHODOLOGY 9
CHAPTER-4: DATA COLLECTION 11
4.1 Case study 1 (Shukan circle to Raspan circle) 12
4.1.1 Site location 12
4.1.2 Layout plan 13
4.1.3 Work Zone Traffic Management Plan 14
4.1.4 Site photos 15
4.1.5 Observations for work zone safety 20
4.2 Case study 2 (SP ring road - service road) 21
4.2.1 Site location 21
4.2.2 Layout plan 22
4.2.3 Work Zone Traffic Management Plan 23
4.2.4 Site photos 24
4.3 Case study 3 (Ujala circle bridge) 25
4.3.1 Site location 25
4.3.2 Layout plan 26
4.3.3 Work Zone Traffic Management Plan 27
4.3.4 Work Zone Traffic Management Plan - PART 1 28
4.3.5 Work Zone Traffic Management Plan - PART 2 29
4.3.6 Site photos 30
CHAPTER-5: DATA ANALYSIS 35
5.1 INTRODUCTION OF WTMP 35
5.1.1 Purpose of Road Signs 35
5.1.2 Road Classifications 35
5.1.3 The following factors shall be considered when designing a taper. 35
5.1.4 Designing of Taper Length for SHORT-DURATION Work 36
5.1.5 Designing of Taper Length for SHORT DURATION and LONG DURATION Work 36
5.1.6 Designing of Taper Length for LONG DURATION Work 36
5.1.7 Traffic Control Devices 36
5.2 Case study - 1: Shukan Circle to Raspan Circle, Nikol 37
5.2.1 Work zone traffic management plan (WTMP) 37
5.2.2 Work zone traffic management plan - PART 1 37
5.2.3 Work zone traffic management plan - PART 2 37
5.2.4 Work zone traffic management plan and section 38
5.3 Case study - 2 SP ring road - service road 39
5.3.1 Work zone traffic management plan (WTMP) 39
5.3.2 Zoomed Plan 39
5.3.3 Work zone traffic management plan section 40
CHAPTER-6: Conclusion 41
REFERENCES 43
APPENDIX 45
Application of Normal Regulatory Signs 45
B TH-1004 / BOG