Evaluation of implementation of BIM and lean integration for infrastructure project in India (Ahmedabad) (Softcopy is also available)

Bansal, Aastha (UC0116)

Evaluation of implementation of BIM and lean integration for infrastructure project in India (Ahmedabad) (Softcopy is also available) - 2020-21 - 68p.

Contents
Chapter 1: Introduction 9
1.1 Background 9
1.2 Need for the study. 9
1.3 Objective 10
1.4 Scope of work 10
1.5 Research Timeline 10
Chapter 2 – Literature Study 11
2.1 Background 11
2.2 Real Estate Success - Value creation 11
2.3 Current Scenario of Real Estate Projects 12
2.4 Failure of Real Estate Projects 12
2.5 Factors affecting Real Estate Project 13
2.5.1 Literature Review 13
2.5.2 Identification of Factors 15
2.6 Classification of Factors 16
2.7 Summary 18
Chapter 3 – Research Gap 19
Chapter 4 – Research Methodology 19
4.1 Introduction 19
4.2 Literature Review 19
4.3 Data Collection 19
4.4 Data Analysis 20
4.5 Conclusion 20
Chapter 5 – Data Collection 21
5.1 Methodology Selection 21
5.1.1 Literature Study for selection of Methodology 21
5.1.2 Methodology Used. 21
5.2 Preparation of Survey form 21
5.3 Conducting Pilot Survey 23
5.4 Main Survey 25
5.5 Data Reliability 26
Chapter 6 - Data Analyses 27
6.1 Questionnaire Survey Analysis 27
6.2 Analysis using Relative Importance Index 28
6.3 Cronbach’s Alpha Test (STAGE 1 ANALYSIS) 28
6.4 RELATIVE IMPORTANCE INDEX (STAGE 2 ANALYSIS) 29
6.5 Screen Valuation Indexes 31
Chapter 7 – Conclusion 33
BIBLIOGRAPHY 34
ANNEXURES 35
SURVEY QUESTIONNAIRE (11 Pages) 35


B TH-0877 / BAN
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials