Resource optimization for construction projects (Also available on CD)
Nagar, Suraj Shenoy
Resource optimization for construction projects (Also available on CD) - 2017 - xiv,80p.,CD-ROM
CONTENTS Acknowledgements iii Abstract iv List of figures vi List of tables vii List of abbreviations viii 1. Introduction 1 1.1. Work Outline 1 1.2. Applicability of the Study 2 1.3. Need for the Study 2 2. Research Design 4 2.1. Objectives of
CPM TH-0287 / NAG
Resource optimization for construction projects (Also available on CD) - 2017 - xiv,80p.,CD-ROM
CONTENTS Acknowledgements iii Abstract iv List of figures vi List of tables vii List of abbreviations viii 1. Introduction 1 1.1. Work Outline 1 1.2. Applicability of the Study 2 1.3. Need for the Study 2 2. Research Design 4 2.1. Objectives of
CPM TH-0287 / NAG