Textbook of estimating and costing (civil) : [including accounts & building bye-laws]
Kohli, D. D.
Textbook of estimating and costing (civil) : [including accounts & building bye-laws] Book - Rev. Ed.11 - New Delhi S. Chand & Co. Ltd. 2004 - x,465,4p.
PART -1: ESTIMATING & COSTING 1. INTRODUCTION 1-12 Types of Estimates. Various drawings attached with estimates. Important terms. Rough cost estimate. 2. MEASUREMENT 13-33 Units of measurement and Payment. 3. ESTIMATES 34-60 Wooden blocks and different shaped figures. Estimation for practice. Different methods of taking out estimates, their applications. Various forms. Quantities of masonry in boundary wall with pillars and panels. Estimate of a platform. 4. DETAILED ESTIMATES 61-126 Important points about estimating. Data required for detailed estimates. Detailed estimates of a shop, room, residential building with flat and pitched roof-complete with report, specifications, cost, material statement. Estimate for provision of a door instead of a window in an existing wall. 5. JOINERY 127-136 Panelled, Panelled and glazed door. Windows. C. Window. Panelled door with glazed ventilator 6. ARCHES 137-142 Design of foundations. Various types of arches and calculations of brick work in arches. 7. TRUSSES 143-150 Truss-Steel Truss, King Post Truss. 8. SPECIFICATIONS 151-177 General definition of specifications. Necessity of specifications. General specifications and detailed specifications of buildings. Detailed specifications of various types of roads. 9. ANALYSIS OF RATES 178-218 Analysis of rates-necessity. Schedule of rates. Task of an artisan per day. Rates and cost of men & material. Analysis of rates of various items. 10. CARRIAGE 219-222 Carriage of material. Rate of carriage w.r.t. load capacity of various vehicles. Problems on transport carriage of material. 11. RCC WORKS 223-239 Introduction with R.C.C. How to measure the length of bar. Estimates of R.C.C. beam, slabs, staircase and method of preparing bar bending schedule. 12. EARTH WORK 240-244 Different cases of canals. Formulae used. Problems. 13. SERVICES 245-268 Estimates of water supply, sanitary and sewerage schemes. 14. ROADS 269-301 Introduction with road estimate. Various methods of finding out earth work. Estimate of various types of road construction. Hilly roads and their estimate. 15. RETAINING WALLS 302-306 Estimates of retaining walls. 16. BRIDGE & CULVERTS 307-335 Introduction. Estimates of culvert and bridges. I.R.C. Table showing loading. 17. VALUATION 336-351 Introduction. Necessity of valuation of building. Definition of terms used. Valuation of a building, Calculation of Standard rent. Concept of capitalized value and year's purchase. Typical problems. TABLES AND USEFUL DATA FOR CIVIL ENGINEERS 353-372 PART - II: BUILDING BYE - LAWS 18. BUILDING BYE-LAWS 375-409 Building Bye-laws. Definitions, Procedure for submission of Building Application and Execution of works. Siting, Planning and Architectural Control. Structural Materials and Control. Forms. PART - III: ACCOUNTS 1. PUBLIC WORKS ACCOUNTS 413-414 Introduction. 50 - Public Works Accounts. Reference Books in Accounts. 2. ORGANISATION AT P.W.D. 415-419 Introduction, Formation of Units, Responsibilities Establishment in PWD. 3. WORKS 420-431 Introduction, Terms in common use, Deposit works, Category of works, Classification of works, Execution of works, Daily Labour, Muster Roll, Casual labour roll, Measurement book. 4. CONTRACTS AND TENDERS 432-440 Introduction, Contractor, Classification of Contracts Piece Work Agreement, Preparation of Contract, N.I.T., opening of tender, Contract Agreement, Forms. 5. STORES 441-451 Introduction, Classification of stores, Stock, Suspense Accounts, Sub-head of Stock, Quantity Account, Indent, Monthly abstract of receipt & issue, Half yearly balance return of stock, Half yearly register of stock, Disposal of surplus material Distribution statement, surplus and shortage of stock, Losses of stock, Tools & Plants, Survey report, Road Metal Material at Site Account. 6. CASH 452-455 Introduction, Cash, Maintenance of cash book, Subsidiary Cash book, Debit & Credit, Common irregularities in writing cash book, Interest, Temporary Advance, Treasury Challan, Miscellaneous. 7. MISCELLANEOUS 456-465 Dealing with railways, Land Acquisition, Organisation, Network analysis.
8121903327
692.5 / KOH
Textbook of estimating and costing (civil) : [including accounts & building bye-laws] Book - Rev. Ed.11 - New Delhi S. Chand & Co. Ltd. 2004 - x,465,4p.
PART -1: ESTIMATING & COSTING 1. INTRODUCTION 1-12 Types of Estimates. Various drawings attached with estimates. Important terms. Rough cost estimate. 2. MEASUREMENT 13-33 Units of measurement and Payment. 3. ESTIMATES 34-60 Wooden blocks and different shaped figures. Estimation for practice. Different methods of taking out estimates, their applications. Various forms. Quantities of masonry in boundary wall with pillars and panels. Estimate of a platform. 4. DETAILED ESTIMATES 61-126 Important points about estimating. Data required for detailed estimates. Detailed estimates of a shop, room, residential building with flat and pitched roof-complete with report, specifications, cost, material statement. Estimate for provision of a door instead of a window in an existing wall. 5. JOINERY 127-136 Panelled, Panelled and glazed door. Windows. C. Window. Panelled door with glazed ventilator 6. ARCHES 137-142 Design of foundations. Various types of arches and calculations of brick work in arches. 7. TRUSSES 143-150 Truss-Steel Truss, King Post Truss. 8. SPECIFICATIONS 151-177 General definition of specifications. Necessity of specifications. General specifications and detailed specifications of buildings. Detailed specifications of various types of roads. 9. ANALYSIS OF RATES 178-218 Analysis of rates-necessity. Schedule of rates. Task of an artisan per day. Rates and cost of men & material. Analysis of rates of various items. 10. CARRIAGE 219-222 Carriage of material. Rate of carriage w.r.t. load capacity of various vehicles. Problems on transport carriage of material. 11. RCC WORKS 223-239 Introduction with R.C.C. How to measure the length of bar. Estimates of R.C.C. beam, slabs, staircase and method of preparing bar bending schedule. 12. EARTH WORK 240-244 Different cases of canals. Formulae used. Problems. 13. SERVICES 245-268 Estimates of water supply, sanitary and sewerage schemes. 14. ROADS 269-301 Introduction with road estimate. Various methods of finding out earth work. Estimate of various types of road construction. Hilly roads and their estimate. 15. RETAINING WALLS 302-306 Estimates of retaining walls. 16. BRIDGE & CULVERTS 307-335 Introduction. Estimates of culvert and bridges. I.R.C. Table showing loading. 17. VALUATION 336-351 Introduction. Necessity of valuation of building. Definition of terms used. Valuation of a building, Calculation of Standard rent. Concept of capitalized value and year's purchase. Typical problems. TABLES AND USEFUL DATA FOR CIVIL ENGINEERS 353-372 PART - II: BUILDING BYE - LAWS 18. BUILDING BYE-LAWS 375-409 Building Bye-laws. Definitions, Procedure for submission of Building Application and Execution of works. Siting, Planning and Architectural Control. Structural Materials and Control. Forms. PART - III: ACCOUNTS 1. PUBLIC WORKS ACCOUNTS 413-414 Introduction. 50 - Public Works Accounts. Reference Books in Accounts. 2. ORGANISATION AT P.W.D. 415-419 Introduction, Formation of Units, Responsibilities Establishment in PWD. 3. WORKS 420-431 Introduction, Terms in common use, Deposit works, Category of works, Classification of works, Execution of works, Daily Labour, Muster Roll, Casual labour roll, Measurement book. 4. CONTRACTS AND TENDERS 432-440 Introduction, Contractor, Classification of Contracts Piece Work Agreement, Preparation of Contract, N.I.T., opening of tender, Contract Agreement, Forms. 5. STORES 441-451 Introduction, Classification of stores, Stock, Suspense Accounts, Sub-head of Stock, Quantity Account, Indent, Monthly abstract of receipt & issue, Half yearly balance return of stock, Half yearly register of stock, Disposal of surplus material Distribution statement, surplus and shortage of stock, Losses of stock, Tools & Plants, Survey report, Road Metal Material at Site Account. 6. CASH 452-455 Introduction, Cash, Maintenance of cash book, Subsidiary Cash book, Debit & Credit, Common irregularities in writing cash book, Interest, Temporary Advance, Treasury Challan, Miscellaneous. 7. MISCELLANEOUS 456-465 Dealing with railways, Land Acquisition, Organisation, Network analysis.
8121903327
692.5 / KOH